CENCAL Demolition was sub contracted to perform interior concrete sawing and slab removal for new construction.
In one evening shift we precut 6500 sq ft of sales floor into manageable 4'x 4' squares. We left the cut slabs in place to allow other trades to conduct over head work off lifts as required. The following evening in 4 hours we removed all the cut pieces to the parking lot area for recycling.