CENCAL Demolition was sub contracted to perform Flat Sawing of an existing bridge to enlarge for multiple lanes. Flat Sawing was required due to the adjacent lane that was required to remain open at all times. Traditional equipment demolition was not allowed. CENCAL Performed Deep Sawing of the bridge deck and bond beam for removal; total thickness was 22 inches.